Start with the ward allocation book and signed hearing notes. It is the source used to decide how repair money is divided when one street drains through two wards; it is not the decision itself. The rule only works if the source describes conditions at the South Ward hall.

Known: the current file counts 43 budget lines checked against ward requests, compared with 48 in the prior window. The responsible board publishes two options with a cost and end date for each. The entries have dates and a named clerk.

Disputed: North Ward counts the upstream work while South Ward counts the homes reached by the runoff. Both figures describe part of the same repair. One side emphasizes the posted total; the other points to a drainage repair entered as a shared cost in two neighboring wards.

Why it matters: the decision determines which residents can rely on the service and which staff must carry out the change. The file does not settle that by itself.

Next: The Year second, cold harbor window 3 file remains open for its scheduled decision. The clerk will publish both ward estimates beside the engineer’s route map.