The Year third, cold harbor window 3 review of the north span load limit reached a new step at the North Span over Mill Channel. Alimited trial begins under the same public measure used in the old file. The Year third, cold harbor window 3 file remains open for its scheduled decision. Masons will record a test load after the new bearing stone is seated.
Rell Doran, bridge inspector, said the latest file records 34 heavy crossings made under the temporary limit. The preceding window recorded 32; the figures cover entries on the register, not every condition at the site.
Carriers say the detour adds a second toll. The inspector says the seam needs one measured load before the limit changes. At the latest public meeting, residents asked the clerk to keep their account beside the source count.
The the stone-load register and repair crew’s closure notes lists 34 heavy crossings made under the temporary limit; the previous window lists 32. Ada Merrow checked both against ward records and interviews with people who use the service. The next measurement is assigned to a second office and will be published with its method.
The Year third, cold harbor window 3 file remains open for its scheduled decision. Masons will record a test load after the new bearing stone is seated.