Q: What changed in the Year third, cold harbor window 2 file?
Rell Doran: The council records a decision for this window and gives its written reason. That changes what is in the record; it does not automatically change the rule.

Q: Which evidence should residents read first?
Rell Doran: the stone-load register and repair crew’s closure notes. This window records 35 heavy crossings made under the temporary limit; the previous window records 32. The dates and the method matter as much as the total.

Q: Why is the disagreement still open?
Rell Doran: Carriers say the detour adds a second toll. The inspector says the seam needs one measured load before the limit changes. Both accounts describe a different part of the North Span over Mill Channel.

Q: What happens at closeout?
Rell Doran: The board recorded the outcome that it closed the request after an independent count confirmed the current measure.

Q: What should the public not assume?
Rell Doran: That one window answers every future case. A new file starts with a new date and a new count.