Cale Dorr opens crane handoffs, pause cards and the shift assignment board at the crane board on North Quay. Before anyone changes a mark, the crew checks a late barge can push the final relief bell into the night watch. The market fall period sets the pace of the work.

The page holds 39 heavy lifts with a recorded relief interval. Cale Dorr reads the preceding count, 43, before the next line is entered. A number without a date would not tell the next crew what changed.

The operator records the scheduled pause. The crew asks that a delayed start move the pause too. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.

Afield visit checks the posted rule against the route residents actually use. The Year first, market fall window 1 file remains open for its scheduled decision. The board will compare planned breaks with actual crane handoffs.

The shift closes with the source page attached to the board. The next file uses a new date and scope.