The first file on the dock shift breaks began with crane handoffs, pause cards and the shift assignment board. The city then checked the source, heard affected residents and sent a second office to repeat the count.
The current Year first, high summer window 3 file records 19 heavy lifts with a recorded relief interval; the previous window records 22. The longer sequence makes the change visible, while each count remains tied to its own dates.
A turning point was the observation that a late barge can push the final relief bell into the night watch. It narrowed the discussion from a general claim to a question about how the rule works at the site.
The operator records the scheduled pause. The crew asks that a delayed start move the pause too. The shared record is larger than it was at the start, although the parties still assign it different weight.
Anew review window opens with a dated question and a named clerk. The Year first, high summer window 3 file remains open for its scheduled decision. The board will compare planned breaks with actual crane handoffs.