A decision on the cold store electricity should be judged at the municipal cold store beside the west canal, where the rule changes an ordinary route, shift or service. Follow a public decision from the signed page to the household that has to live with it. The current file is the Year fifth, high summer window 1 review, not a permanent settlement of every future case.

The meter readings, outage notices and cooperative invoices lists 90 hours held within the posted temperature band; the previous window lists 88. Marek Stone checked both against posted terms set beside signed receipts and final invoices. The difference matters because how shared storage costs are split when a replacement meter spans two billing periods.

The utility counts from its exchange date. The cooperative says the new meter missed the outage at changeover. Those objections deserve a clear answer. They are not a reason to keep an uncheckable rule simply because its wording is familiar.

A useful decision names who will do the work, which count will change and when the result comes back to the public table. In this case, the meter was replaced during a three-hour outage.

The Year fifth, high summer window 1 file remains open for its scheduled decision. The utility will align the exchange record with the outage notice.