A decision on the cold store electricity should be judged at the municipal cold store beside the west canal, where the rule changes an ordinary route, shift or service. Follow a public decision from the signed page to the household that has to live with it. The current file is the Year second, river rise window 1 review, not a permanent settlement of every future case.

The meter readings, outage notices and cooperative invoices lists 22 hours held within the posted temperature band; the previous window lists 20. Ada Merrow checked both against ward records and interviews with people who use the service. The difference matters because how shared storage costs are split when a replacement meter spans two billing periods.

The utility counts from its exchange date. The cooperative says the new meter missed the outage at changeover. Those objections deserve a clear answer. They are not a reason to keep an uncheckable rule simply because its wording is familiar.

A useful decision names who will do the work, which count will change and when the result comes back to the public table. In this case, the meter was replaced during a three-hour outage.

The Year second, river rise window 1 file remains open for its scheduled decision. The utility will align the exchange record with the outage notice.