The Year fourth, river rise window 1 review of the canal sluice schedule reached a new step at the South Canal sluice house. The responsible board publishes two options with a cost and end date for each. The Year fourth, river rise window 1 file remains open for its scheduled decision. The canal crew will post a checked clock reading beside each release.

Iven Holt, canal operator, said the latest file records 56 release minutes recorded at the lower gate. The preceding window recorded 56; the figures cover entries on the register, not every condition at the site.

Millers use the gate clock to plan a shift. Canal crews compare it with the marked level on the stone wall. At the latest public meeting, residents asked the clerk to keep their account beside the source count.

The the gate release board and millers’ water receipts lists 56 release minutes recorded at the lower gate; the previous window lists 56. Ada Merrow checked both against ward records and interviews with people who use the service. The next measurement is assigned to a second office and will be published with its method.

The Year fourth, river rise window 1 file remains open for its scheduled decision. The canal crew will post a checked clock reading beside each release.