The Year second, river rise window 2 review of the canal sluice schedule reached a new step at the South Canal sluice house. The responsible board publishes two options with a cost and end date for each. The Year second, river rise window 2 file remains open for its scheduled decision. The canal crew will post a checked clock reading beside each release.

Iven Holt, canal operator, said the latest file records 84 release minutes recorded at the lower gate. The preceding window recorded 87; the figures cover entries on the register, not every condition at the site.

Millers use the gate clock to plan a shift. Canal crews compare it with the marked level on the stone wall. At the latest public meeting, residents asked the clerk to keep their account beside the source count.

The the gate release board and millers’ water receipts lists 84 release minutes recorded at the lower gate; the previous window lists 87. Tomas Reed checked both against time-stamped route logs checked against field visits. The next measurement is assigned to a second office and will be published with its method.

The Year second, river rise window 2 file remains open for its scheduled decision. The canal crew will post a checked clock reading beside each release.