Marek Stone opens toll receipts, repair invoices and the two towns’ agreement at the toll booth at Westbank Bridge. Before anyone changes a mark, the crew checks one invoice includes a winter closure after the collection gate was closed. The market fall period sets the pace of the work.

The page holds 93 receipts assigned to a dated repair line. Marek Stone reads the preceding count, 94, before the next line is entered. A number without a date would not tell the next crew what changed.

The toll keeper counts each calendar day. The neighboring council says a closed span cannot accrue a crossing fee. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.

Afield visit checks the posted rule against the route residents actually use. The Year third, market fall window 3 file remains open for its scheduled decision. The two treasurers will reconcile receipts with the bridge closure board.

The shift closes with the source page attached to the board. The next file uses a new date and scope.